Who supplies, installs and maintains APC UPS systems in Adelaide?
Subnet does. We are based in Forestville, Adelaide, and have supplied and installed APC power protection for South Australian organisations since 2017, across more than 70 projects and orders. That ranges from a single Smart-UPS in a comms cupboard to racks and power for a complete server room. We size the unit, install and test it, and replace batteries or whole units when they are due.
How often do UPS batteries need replacing?
It depends on the battery type. Sealed lead-acid batteries are generally planned for replacement every three to five years, sooner in a warm room or after frequent outages. APC states that the lithium-ion batteries in its Smart-UPS range last about three times as long, so they often outlast the UPS. Either way, the unit should report battery health so replacement is planned and not discovered during a power cut.
Can a UPS battery be replaced, or do we need a new UPS?
In most cases the battery can be replaced. APC Smart-UPS units use replaceable battery cartridges, and the UPS itself normally outlasts its first battery. A new unit makes more sense when the model has reached end of life, the load has outgrown it, or the cost of a battery is close to that of a current model with a longer-life lithium-ion battery. Subnet checks the model, age and load before recommending either.
Do we still need a UPS if we have a generator?
Yes. A generator takes time to start, and a UPS carries the equipment through that gap so servers and network devices do not drop. It also smooths the power the generator supplies, which can be less stable than mains. The two do different jobs: the UPS covers seconds to minutes and protects against dips and surges, and the generator covers long outages.
What is the difference between line-interactive and double-conversion online UPS designs?
Schneider Electric describes two basic designs for UPS systems below 5000VA. A line-interactive unit conditions incoming power and switches to battery only when the supply falls outside safe limits, so it has a short transfer time. A double-conversion online unit runs connected equipment continuously from its inverter, which isolates it from grid fluctuations and has no transfer time. Schneider Electric suggests online designs for servers and critical infrastructure, and for loads with redundant power supplies or an automatic transfer switch. Smart-UPS models come in both designs, so the choice should follow what is being protected and the quality of power at the site.
How do we work out what size of UPS we need?
Start by listing the equipment to be protected and its power draw in watts, then check the UPS rating in both watts and VA, because VA is usually the higher figure. Schneider Electric advises leaving headroom for peaks and future growth and aiming for a connected load of around 80% of the unit's capacity, noting that running near the limit reduces efficiency, adds heat and shortens runtime. Its guidance also covers the input and outlet types, voltage and whether the load is single-phase or three-phase. Measured loads and a growth allowance should go into the scope rather than nameplate estimates.
How long will a UPS keep our equipment running in an outage?
It depends on the battery capacity, the load and the model, so there is no single figure. Schneider Electric's own example shows the same unit lasting roughly 9.5 minutes at 80% load and 6.5 minutes at full load, and directs buyers to each unit's runtime graph. Adding equipment shortens runtime. Extended-runtime options exist, and APC describes Smart-UPS Ultra as having scalable runtime options. Decide whether the aim is a few minutes for a clean, orderly shutdown or longer operation, and what must keep running. Management software and network cards can be used to shut systems down safely during an extended outage.
What does lithium-ion change in a Smart-UPS, and does the battery still need planning?
APC says Smart-UPS Ultra uses lithium-ion batteries, and its Australian product listing describes them as lasting three times as long as VRLA batteries and not needing replacement during the UPS's life. A separate APC statement puts lead-acid life at roughly three to five years and lithium-ion at up to ten, with a five-year warranty on the UPS and internal batteries for the Ultra models checked. These are vendor claims, and real battery life depends on the model, temperature and use. Warranty terms, ownership of replacement and a replacement date for each site are worth recording in the scope.
Which equipment should be on UPS power?
Typically the equipment that must keep running or shut down cleanly: servers, storage, network switches, firewalls and the internet connection that lets people reach them. Schneider Electric advises protecting essential devices only, because every added device shortens runtime, and notes that surge-only outlets can protect secondary equipment without drawing battery power. APC's edge resilience whitepaper treats power, cooling and network as dependencies of business applications. A short dependency list, covering what must stay up, what needs only a controlled shutdown and what is not protected, is a useful input to sizing.
What happens when a UPS model reaches end of life?
APC product listings carry lifecycle dates. For example, one Smart-UPS Ultra model page shows a discontinuation date and an end-of-standard-service date. Batteries, network cards and service options for a given unit can therefore change over time. For a site with several UPS units, a register of models, installation dates, warranty end dates and planned replacement dates avoids surprises. Whether to replace a unit or only its battery is a cost and risk decision for each site and model.